![]() |
SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997 |
|
![]() |
|
Thread Tools | Display Modes |
|
![]() |
#1 |
Sea Lord
![]() Join Date: Mar 2010
Location: Republiken Finland
Posts: 1,803
Downloads: 8
Uploads: 0
|
![]()
Gentlemen, you seem to be making assumption which is not necesssarily true. That is that there was signal displaying danger aspect. In early 2000s in Savonia Railway in Finland between Kouvola and Mikkeli (don't remember exact spot) was incident where two passengers trains travelling in opposite directions had routes set and protected into same single tracked block with all main and distant signals displaying Proceed and Expect Proceed aspects.
Disaster was avoided only because one of train drivers remembered that there was supposed to be passing at loop and he should have had route set into loop track. Therefore distant signal should have had Expect 35 (proceed at maximum speed of 35 km/h, points ahead are set for diverging route) aspect instead of Expect Proceed. This isn't very unlike scenario but still possible.
__________________
You talk to God, you're religious. God talks to you, you're psychotic. - Dr. House |
![]() |
![]() |
![]() |
|
|