SUBSIM Radio Room Forums



SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997

Go Back   SUBSIM Radio Room Forums > General > General Topics
Forget password? Reset here

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-17-15, 02:48 PM   #18
Rockstar
In the Brig
 
Join Date: Nov 2002
Location: Zendia Bar & Grill
Posts: 12,614
Downloads: 10
Uploads: 0


Default

I got a house which was finished in 1895 and I am currently renovating the upstairs bathroom which up until the time I arrived used to have a heavy cast iron claw foot tub.

Anyway, I took up the old plank subfloor and the joists are exposed top and bottom, they are the usual hand cut true 2x8 used for everything in homes this old. Outwardly they looked ok but after dry fitting a new subfloor I notice two joists underneath where the tub used to be had a serious of sag in them.

I now plan to replace all the joists. Anyone familiar with the latest construction requirements for the minimum size floor joist needed to span 9.5 feet 16 inch on center?




btw the old tub is NOT going back. It was so heavy that we could not get it down stairs. I covered it with old tarp and took a 10 pound sledge and it shattered into pieces.

Last edited by Rockstar; 12-17-15 at 02:55 PM.
Rockstar is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 04:48 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 1995- 2025 Subsim®
"Subsim" is a registered trademark, all rights reserved.