SUBSIM Radio Room Forums



SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997

Go Back   SUBSIM Radio Room Forums > General > General Topics
Forget password? Reset here

Reply
 
Thread Tools Display Modes
Old 08-28-15, 07:29 AM   #1
Rockstar
In the Brig
 
Join Date: Nov 2002
Location: Zendia Bar & Grill
Posts: 12,614
Downloads: 10
Uploads: 0


Default

A concrete sample was pulled from the Cocoli Locks which recently sprang a leak in one its sills, and it doesnt look good.

Quote:
Grupo Unidos por el Canal (GUPC), the main contractor for the Third Set of Locks project, issued a statement last Friday acknowledging the leaks, but has since gone quiet.



http://gcaptain.com/a-concrete-sampl...2#.VeBTnMT3arU
Rockstar is offline   Reply With Quote
Old 08-28-15, 08:08 AM   #2
Oberon
Lucky Jack
 
Join Date: Jul 2002
Posts: 25,976
Downloads: 61
Uploads: 20


Default

Sheesh...that is not a good looking bit of concrete there.

Quote:
GUPC is a consortium made up of Sacyr Vallehermoso of Spain as its head, with Impregilo of Italy, Jan De Nul of Belgium and Constructura Urbana, SA (CUSA) of Panama.
This explains a lot...Spain and Italy...not really known for their construction and engineering projects post 500AD.

Still...could be worse, the Three Gorges Dam has been long suspected of having hairline cracks, and of being on top of a faultline. If that thing goes, it'd be like dropping a nuke on China.
Oberon is offline   Reply With Quote
Old 08-28-15, 08:40 AM   #3
Aktungbby
Gefallen Engel U-666
 
Aktungbby's Avatar
 
Join Date: Jul 2013
Location: On a tilted, overheated, overpopulated spinning mudball on Collision course with Andromeda Galaxy
Posts: 30,021
Downloads: 24
Uploads: 0


Default

Quote:
Originally Posted by Rockstar View Post
A concrete sample was pulled from the Cocoli Locks which recently sprang a leak in one its sills, and it doesnt look good.






http://gcaptain.com/a-concrete-sampl...2#.VeBTnMT3arU
The concrete evidence is....it's shoddy!" GUPC was one of three pre-qualified international consortiums bidding on the tender for the design and construction of the Third Set of Locks, a tender process that involved a thorough technical and pricing evaluation. The contract winner was selected based on the “non-negotiated best value proposal”, i.e. the one that obtained the highest combined score for their Price Proposal and Technical Proposal using a weighted model where the Technical Proposal was assigned 55 percent of the total score and the Price Proposal was assigned 45 percent of the total score.
Ultimately, GUPC was selected as the winner with the highest technical score and lowest total (fixed) price proposal at $3.221 billion." < all that BS adds up to:Teddy Roosevelt is rolling over in his grave!
__________________

"Only two things are infinite; The Universe and human squirrelyness?!!

Last edited by Aktungbby; 08-28-15 at 08:49 AM.
Aktungbby is online   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 12:21 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 1995- 2025 Subsim®
"Subsim" is a registered trademark, all rights reserved.