SUBSIM Radio Room Forums



SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997

Go Back   SUBSIM Radio Room Forums > General > Sub & Naval Discussions: World Naval News, Books, & Films
Forget password? Reset here

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-26-15, 12:36 AM   #4
ikalugin
Ocean Warrior
 
Join Date: Aug 2014
Location: Moscow, Russia
Posts: 3,212
Downloads: 8
Uploads: 0


Default

Well those articles come out every so often. In reality the situation is not as grim (or optimistic). The question is - would Navy receive all of its money allocated under GPV2020, or would it suffer cuts?

Russian Navy however does face challenges with ocean going major surface combatants, which cannot be replaced before 2020. That said, our priorities were always deterence->coastal defense-> power projection, hence SSBNs (and relevant supporting assets), close in area ships (frigates, corvetes, ssks) have a priority in short to medium term.

You could see that in borei construction, refurbishment of Black Sea Navy. Overall GPV2020 gives us an adequate minimal force, in 2020-2030 timeline we may build major ships.
__________________
Grumpy as always.
ikalugin is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 08:09 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 1995- 2025 Subsim®
"Subsim" is a registered trademark, all rights reserved.