![]() |
SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997 |
![]() |
#4 |
Ace of the Deep
![]() Join Date: Mar 2007
Posts: 1,288
Downloads: 85
Uploads: 0
|
![]()
Well, sorta. The Hellcat design was refined on the basis of test flights of the captured Zero. However, design work on the Hellcat began in June 1941 with the prototype making its first flight on 26th June 1942 about the time when the Akutan Zero was recovered and sent to the US for evaluation.
|
![]() |
![]() |
|
|