SUBSIM Radio Room Forums



SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997

Go Back   SUBSIM Radio Room Forums > Subsim International > Foro Hispano de Subsim
Forget password? Reset here

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-26-07, 03:06 PM   #16
Kron161
Sailor man
 
Join Date: Mar 2001
Posts: 47
Downloads: 7
Uploads: 0
Default

aaaa
Quote:
Originally Posted by Johann Vilthomsen
This first phase of the lining of the walls, is being more complicated than expected. There are many things that need to be done, like the electrical box, that needs to be left accessible if need be.
A sample of the work done with the electrical box.



Finished the first section, I start the second one.

Once finished, the second, I install the piece that will allow the Hull's rib to look like a IP section iron rib.


Adjusting the piece to the side. (Note the pencil mark with the inclination for the cut)

Installed and ready the first rib with the union plate bolted to to it.



To allow you to understand how I do to make it look an Iron IP rib, I upload this shot with a piece of provisional channeled wood board, with round edges, that will be the "wings" of the inverted T rib's cross section.


First and second sections done... ready for the third!



If I can, tomorrow more
.
Kron161 is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:52 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright © 1995- 2024 Subsim®
"Subsim" is a registered trademark, all rights reserved.