SUBSIM Radio Room Forums



SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997

Go Back   SUBSIM Radio Room Forums > General > General Topics
Forget password? Reset here

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 09-20-19, 09:21 AM   #2
Skybird
Soaring
 
Skybird's Avatar
 
Join Date: Sep 2001
Location: the mental asylum named Germany
Posts: 42,662
Downloads: 10
Uploads: 0


Default

From a news report about the govenrment's answer to a question of the AfD:


"In 2009, outage work amounting to 73.7 gigawatt hours (GWh) was caused by feed-in management measures. In 2018, however, it was a total of 5402.7 GWh. In the previous year, the volume was even higher: 5518.0 GWh."


Its about the instability caused in the powergrid due to feeding in the energy from unstable and unreliably varying reneweable energy, namely wind and so9lar. The factor in the change from 2009 to 2017/2018, is roughly 74.
__________________
If you feel nuts, consult an expert.
Skybird is online   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 06:01 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 1995- 2025 Subsim®
"Subsim" is a registered trademark, all rights reserved.