![]() |
SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997 |
![]() |
#16 |
Swabbie
![]() Join Date: Feb 2012
Posts: 10
Downloads: 0
Uploads: 0
|
![]()
The Tullibee's shaft broke due to a rear end misalignment combined with a machinsts error. The original shaft machinist went too deep on a cut between two sleeves (into the shaft metal, which is why it broke where it did)... and while in Rota the Charleston shipyard tiger team actually moved the front and back shaft holes by several inches apiece (weeks of welding, plating, and boring). After a cursory JAG investigation during which I was told it was my word vs the captain's... The skipper lied to the JAG and then in front of the crew at quarters on the work barge in Rota (it ain't slander unless it's false) about no one telling him (even though we had wrenches and air masks hanging from pipes back in shaft alley for 3 weeks before the break; AND I PERSONALLY TOLD THE Captain AND SHOWED HIM our evidence of the break)... and we eyewitnesses got told to shaddup or go to Leavenworth. NIS tortured me over this for 4 hours in a hothouse on the Goose Creek Weapons Station and forced me to sign a false (DICTATED) confession which has made my life hell to date. Come get me you Jerkoffs! I'm old enough to no longer care. Btw, the lying skipper kept his job until he later beached us at Daytona while arguing right of way issues with a sailboat over a megaphone). I got accused of calling the Boston Globe about the incident (the quoted news story in this thread), but it wasn't me... I was on watch in drydock during pumpdown when the Globe reporter was called from Rota).
|
![]() |
![]() |
|
|