![]() |
SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997 |
![]() |
#1 |
Seaman
![]() Join Date: May 2006
Posts: 36
Downloads: 42
Uploads: 4
|
![]()
Hi there
![]() I am trying to piece together a few things in my head to help myself with learning accurate TMA. One of the things that is bothering me somewhat is: I have located a contact and identified it (Amethyste) DEMON shows that it is moving at 4kts. I am moving at 7 knots. I have determined its course and have now changed course so that I am moving on an opposite course moving parrallel to it. Does this mean now that in my TMA I must plot the speed as 11 knots (OS speed + Target speed = bearing line separation I think) or do I still keep the targets speed in TMA as 4kts? I have determined that if I plot 4kts into TMA it is about 8nm away and if I plot 11kts it is about 12nm away if thats any help. I would be most grateful for any help as this is annoying me somewhat and I need to decide which of these two theorys of mine are correct :hmm: Cheers in advance |
![]() |
![]() |
|
|