SUBSIM Radio Room Forums



SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997

Go Back   SUBSIM Radio Room Forums > General > General Topics
Forget password? Reset here

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-16-11, 11:04 PM   #1
Cpt. C. Wallace
Nub
 
Join Date: Aug 2011
Location: Perris, CA
Posts: 2
Downloads: 57
Uploads: 0
Default In The News

Navy Takes Early Delivery of PCU California - 8/8/2011
From Naval Sea Systems Command Public Affairs

NEWPORT NEWS, Va. (NNS) -- The Navy took delivery of PCU California (SSN 781) from Huntington Ingalls Industries - Newport News Shipbuilding (HII-NNS), Aug. 7, more than eight months earlier than the scheduled contract delivery date.

"The quality and professionalism of our Navy/shipbuilding team is evident in California's outstanding performance during its recent sea trials and early delivery," said Program Executive Officer for Submarines, Rear Adm. David Johnson.

California required 65 months to build - five months less than the previous submarine, USS New Mexico (SSN 779), delivered by what was then Northrop Grumman Shipbuilding. California, the eighth Virginia-class submarine, is the first delivered under the HII-NNS banner.

Prior to delivery, California passed a battery of at-sea tests including the Board of Inspection and Survey Trials.

"California's successful run through each successive sea trial, and its early delivery, means the Navy will add another highly-capable, eagerly-anticipated Virginia-class submarine to the fleet to meet operational demands," said Rear Adm.(Select) Michael Jabaley, Virginia-class program manager. "California, along with her sister ships, will provide unmatched capabilities to the fleet while honoring the proud traditions of her namesake state."

The next major event for California will be its commissioning Oct. 29 in Norfolk, Va. California's commissioning is the second-to-last major acquisition milestone for the Virginia-class program in 2011. The christening ceremony for PCU Mississippi (SSN 782) will cap off the year this December, in Groton, Conn.

Virginia-class submarines are designed to dominate the world's littoral and deep waters while conducting anti-submarine; anti-surface ship; strike; special operation forces; intelligence, surveillance, and reconnaissance; irregular warfare; and mine warfare missions. The inherent stealth, endurance, firepower, and sensor suite of these submarines enable them to support five of the six Maritime Strategy core capabilities - sea control, power projection, forward presence, maritime security, and deterrence.
http://www.sublant.navy.mil/

Last edited by Cpt. C. Wallace; 08-16-11 at 11:14 PM.
Cpt. C. Wallace is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 10:25 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 1995- 2025 Subsim®
"Subsim" is a registered trademark, all rights reserved.