A concrete sample was pulled from the Cocoli Locks which recently sprang a leak in one its sills, and it doesnt look good.






http://gcaptain.com/a-concrete-sampl...2#.VeBTnMT3arU
The concrete evidence is....it's shoddy!" GUPC was one of three pre-qualified international consortiums bidding on the tender for the design and construction of the Third Set of Locks, a tender process that involved a thorough technical and pricing evaluation. The contract winner was selected based on the “non-negotiated best value proposal”, i.e. the one that obtained the highest combined score for their Price Proposal and Technical Proposal using a weighted model where the Technical Proposal was assigned 55 percent of the total score and the Price Proposal was assigned 45 percent of the total score.
Ultimately, GUPC was selected as the winner with the highest technical score and lowest total (fixed) price proposal at $3.221 billion." < all that BS adds up to:Teddy Roosevelt is rolling over in his grave!