SUBSIM Radio Room Forums



SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997

Go Back   SUBSIM Radio Room Forums > Current crop of subsims & naval games > Wolfpack
Forget password? Reset here

Reply
 
Thread Tools Display Modes
Old 09-01-16, 02:02 AM   #1
Catfish
Dipped Squirrel Operative
 
Catfish's Avatar
 
Join Date: Sep 2001
Location: ..where the ocean meets the sky
Posts: 16,898
Downloads: 38
Uploads: 0


Default

Quote:
Originally Posted by rentacow View Post
[...]
Does anyone know how the circuit from a motor acting as a generator was wired to the battery and then to the other motor? did they bridge the port and starboard batteries in parallel? Possibly you could arrange the switched in such a way to run the motors at double their working voltage for more power in an emergency for a short time or on accident and burn out the motors.
Only thing i saw in the U 995 recently was there were switches for a parallel circuit ('Parallelschaltung') and connection in series ('Hintereinanderschaltung'), but i do not know what this referred to..
Max speed at 7/8 knots could not be further improved as far as i know, and it would only be possible to maintain this speed for roughly an hour.

Batteries were not divided laterally in left and right ones, though you could of course bridge cells and remove damaged ones from the circuit if need be.
__________________


>^..^<*)))>{ All generalizations are wrong.
Catfish is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 11:17 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright © 1995- 2024 Subsim®
"Subsim" is a registered trademark, all rights reserved.