Thread: My first build
View Single Post
Old 03-11-09, 08:04 PM   #24
Bill Nichols
Master of Defense
 
Join Date: Mar 2000
Posts: 1,502
Downloads: 125
Uploads: 0
Default

Part 3: Installing the drives and graphics/sound cards.

Now is a good time to attach the cables for the case's front panel to the motherboard:



This case has lots of cutouts on the back side panel where we can route the cables out-of-sight.



The hard drives sit in sliding trays, which makes installation a breeze.





The optical drive slides in from the front. The button I'm pointing to locks it in place -- no screws required!



The data cables for the drives are now attached to the motherboard.



Now it's time to install the graphics card. It's a monster!



If one is good, two must be better! Each graphics card gets requires two power cables! Now you can see why I went with a 1000 Watt power supply. Note the SLI 'bridge' connecting the two cards.



The SoundBlaster card is the last to be installed.



__________________
My Dangerous Waters website:

Last edited by Bill Nichols; 03-12-09 at 06:23 AM.
Bill Nichols is offline   Reply With Quote