View Single Post
Old 12-26-07, 01:52 PM   #3
Kron161
Sailor man
 
Join Date: Mar 2001
Posts: 47
Downloads: 7
Uploads: 0
Default

aaaa
Quote:
Originally Posted by Johann Vilthomsen
Let's go on.
Opening on the wall for the exhaust fan of the model paint table.



The worker is opening a hole on the side of the "bridge" (that's how I call this terrace!). in this shot you can see the compressor machines for the AC that will make more comfortable the life in my particular u-boot. Check the hole in the wall left for the conection to the inside machinery so nothing will hang arround to disrupt normal operation on the "bridge"




On 16th october 2007 at 0750, I get the ceiling main longitudinal top stiffener beam. It has nothing less than 4,745 m.
I've used the elevator from the workers that are reparing the roof to raise it to the 15 m of height where the room is.




Getting the log inside the room



Placed on the ground on exactly the same position it will have... once it is located on the ceiling.

Now there are only missing the side panels. The block that will do the access hatch to the room and the circular ribs cut on a precision machine to have them all identical. I guess they'll advise me any moment that they are ready!
.
Kron161 is offline   Reply With Quote