View Single Post
Old 06-16-22, 05:56 PM   #5
Bubblehead1980
Navy Seal
 
Join Date: Apr 2009
Location: Florida USA
Posts: 6,922
Downloads: 550
Uploads: 42


Default

Quote:
Originally Posted by derstosstrupp View Post
When the crew went to maneuvering stations, which would be entering/leaving port, they would remove the control box from the tower interior and bring it up to the bridge and mount it. It wasn’t permanently mounted up there.


Interesting. Did they switch to manual power when under silent running conditions or since it was electric not hydraulic, quiet enough to run on normal power?
Bubblehead1980 is offline   Reply With Quote