View Single Post
Old 09-11-08, 06:31 PM   #5
Erich dem Roten
Electrician's Mate
 
Join Date: Aug 2008
Location: Connecticut
Posts: 134
Downloads: 15
Uploads: 0
Default

I've wondered the same thing...I got a type IV torp about a year before they were shown to be produced, but couldn't get a newer conning tower till 8 or so months after their introduction.

I think the specific dates change according to which flotilla you're serving with (or so it seems). At least that's the way different sub types work. I'm sure one of the SH3 vets has a solid answer.
__________________
Erich dem Roten is offline   Reply With Quote