finished both sides of the TIIA for the water hole drains. Added one drain (currently) to each side of the conning tower. More to come. Fixed (as best as can be done) the water drains showing without water going over them (it's about 95% good). Screenies:
from an emergency surface:
http://i228.photobucket.com/albums/e...s_con_dr-1.jpg
http://i228.photobucket.com/albums/e..._con_drain.jpg
newest changes to the files can be found at post #2 of this thread.
http://www.subsim.com/radioroom/show...93&postcount=2