Its not the date of the mission that matters, but the CFG date, of the player unit placed as a starting point.
You can create a map in 1942, and set the player CFG date to 19430601 for example, and all boats or configurations of boats that correspond to that 01 june 43 will be avilable even though the mission date is in 1942
The pisser is, even if you create a late war mission, the mission editor still defaults the player cfg date to some silly 1941 date. So you have to manually edit it via notepad or wordpad.
|