View Single Post
Old 06-28-07, 07:07 PM   #5
Snacko
Engineer
 
Join Date: Apr 2005
Posts: 212
Downloads: 58
Uploads: 0
Default

Nope, setting the Unit Version Date didn't help for me.

I did finally get a Gato as the default by changing the Mission year from 1943 to 8/12/1941. I looked at another mission that used a Gato and set the Mission and Sub to that date. It worked.

I'm guessing that the game was saying that the Gato was out of commision and so it gave me the next sub, a Gar?

So, I need to know the Entry and Exit date for 'every' sub to set the Mission dates if I want to pic a specific sub??
__________________
Snacko is offline   Reply With Quote