View Single Post
Old 08-29-06, 12:52 AM   #2
JScones
Navy Seal
 
Join Date: Apr 2005
Posts: 5,501
Downloads: 19
Uploads: 0
Default

Running SH3Cmdr with the "Correct u-boat availability dates" option selected? If so, check the table and detail outlined in the SH3Cmdr help file.

BTW, you can get around SH3Cmdr's 100 day "days spent in base" limitation by editing SH3Cmdr.ini directly. Simply change the DaysInBaseValue entry to whatever you want.
JScones is offline   Reply With Quote