Quote:
Originally Posted by Skybird
The question is also where the electricity for these is coming from. That they build production sites does not mean that these produce at 100% - or at all. I expect that their factories produce only at a fracton of their designed capacities.
|
The Transmission System Operators of Continental Europe will increase their export capacity to Ukraine and Moldova by 400 megawatts (MW) to 2.1 gigawatts (GW) starting Dec. 1