View Single Post
Old 02-21-13, 10:28 PM   #1
Obviously5Believer
Swabbie
 
Join Date: Apr 2011
Posts: 11
Downloads: 175
Uploads: 0
Default Non-realistic equipment upgrades

I'm running TMO 2.5, RSRDC, and OTC 1.5 and I get what I believe are really early dates for most equipment upgrades. I started on Dec 2, 1941 in a Sargo boat and was given the option to install SJ radar right away. Then I was given a Tambor and then the USS Balao the next patrol, and it's August, 1942. Balao class didn't enter commission until 1943. Is there any fix to these issues?
Obviously5Believer is offline   Reply With Quote