Thread: www.uboat.net
View Single Post
Old 04-02-10, 10:32 AM   #6
janh
Stinking drunk in Trinidad
 
Join Date: Jan 2010
Posts: 349
Downloads: 0
Uploads: 0
Default

Quote:
Originally Posted by msxyz View Post
Commissioned does not mean operational. It means the vessel is completed, launched and ready to carry preliminary tests. A skeleton crew has been assigned to it to carry out all the rest of the checks and proof tests.
...
Buddy, I know what commissioned means. But if you would have spent the time to read the linked reference, you would have seen that a 2-digit number of Electroboats where in the later stages of training and deployment. You could have saved yourself a load of time typing your answer...

BTW, you may revise some of your info after looking more solidly into the topic. The German industry was in shambles, but it had a higher output during the 43, 44 and most likely the highest 45 (propagated) despite the bombings. In the reference you will also see that only a minor fraction of boats was not produced due to bombing campaign, but the major fraction substantially delayed by organizational/logistical mishaps not yet ironed out of the production process. That is impressive, isn't it?
__________________
Scientific facts are not determined by the opinion of the majority, nor by a democratic vote.
janh is offline   Reply With Quote