![]() |
Days in base
does anyone know if there is an official time required between objectives when in base, I thinking about campaign design.
thanks |
Quote:
Wish I could be more help, but I just don't know the answer to this one. |
Hi sidlslotm,
the closest I found for that while I was working in the British Campaign is UPC.cfg in the DATA/Cfg folder Code:
[MissionManager] Hope it is what you're looking for. |
thanks for that fella's, I have just found the upc file and have been messing with dates. I have been looking for predictable results that have so far eluded me. The idea is specific dates and places for the campaign.
thanks http://www.gamefront.com/files/21341...paign_V2_2_rar |
Do you mean that you want a historical mission to be assigned to your boat in a very defined time frame?
If this is what you want to do, you should add the historical mission to the PatrolObjectives.cfg in Data\UPCData\UPCCampaignData and tinker with the startdate and enddate fields so your boat can fulfill the mission in the right time. Code:
[Section 81] |
Yes you have that exactly right JL, I have 4 missions in 1939 one of which is off the Heligoland Blight, the Brits lost a number of boats in these very dangerous waters, I wanted to create missions with tension more than a blast everything that floats.
The dates is what I have been tinkering with, but so far I have failed to understand the exact formular for the SH4 mission control. I have still to to test the dates below. The problem seems to be, as four months go by the ingame start time accumulates days for some reason, the startDate/EndDate is out sync causing a crash, I think, lol. [Section 1] ID=ID1 FileName=Data/Campaigns/Campaign/PatrolObjectives/Heligoland Bight/Heligoland Bight.mis StartDate=19390901 <>---------- EndDate=19390928 <>---------- GameModes=Career |
Quote:
The start and end dates you chose are only for one month: from September 1st to 28th. That means that your boat could get this mission assigned only in that time frame, not later. If you want to extend the chance of getting this mission assigned to four months, you should change the end date to December 1939, or 19391231 (or even later, if you so wish). But, if that was the problem, I don't think you would get crashes, but only that you would never get this mission assigned after the first month of war. |
Quote:
This is from the mission: [Mission] MissionType=0 MissionDataType=1 MultiMissionType=0 Year=1939 Month=9 Day=3 <-------- The mission startdate is the 3rd but you set it up to start on the 1st. If it starts on the 1st or 2nd it will probably not work. |
thanks for that guys, I hear what you say and will try further. Thanks Peabody, I have been messing with dates for a couple of weeks now trying to understand the math, the start date was one I missed. But I believe JL is right when he talks about timeframe and this is what Iv'e been messing with, as follows.
<StartDate><PatrolTimes><DaysinBase> etc, etc. I can only do this for a month or so at a time and then have to put in down, else madness ensues. I'm really only trying to keep my 62 year old mind working while it's cold out. So this will be a week of guitar practice for me, back into the sanity of music. :salute: |
All times are GMT -5. The time now is 12:27 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 1995- 2025 Subsim®
"Subsim" is a registered trademark, all rights reserved.