![]() |
Few more hatches done.
http://img223.imageshack.us/img223/6...g004gn3.th.jpg Inner chamber in place, delicate weathering. http://img90.imageshack.us/img90/288...g006cd6.th.jpg Light. Slightly diferent than what ive seen on the fotos of U-552. http://img171.imageshack.us/img171/8...2001nq2.th.jpg Light cut out. http://img391.imageshack.us/img391/7...2002dw8.th.jpg The backing plate for the new light. Made out of brass in order to fill sides in the conning tower- light joint. http://img219.imageshack.us/img219/6...g001yb4.th.jpg The water breaker in place, the bottom edge filled. Two litle holes made on the sides, missed on the kit- present on fotos. http://img356.imageshack.us/img356/8...g005ox6.th.jpg Deck with the strip of styrene backup. It is needed to bring the thickness of the deck to the same levell as the water deflector. http://img140.imageshack.us/img140/7...g007tx9.th.jpghttp://img375.imageshack.us/img375/3...g008mp9.th.jpghttp://img381.imageshack.us/img381/9...g009kb8.th.jpg TBC... |
"... Inner chamber in place, delicate weathering. ..."
Very nice :up: |
Thanks Batr8for3. :up:
Work on light goes on. http://img262.imageshack.us/img262/5...t002bs3.th.jpghttp://img262.imageshack.us/img262/4...t004ic0.th.jpghttp://img375.imageshack.us/img375/3...ght1pr9.th.jpg TBC... |
Just one word: EXCELLENT!!!:up: :up:
|
Quote:
The light fairing almost done. Shape is good- all i need to do now i sand it smooth. http://img180.imageshack.us/img180/2...r001gr7.th.jpghttp://img180.imageshack.us/img180/9...r004gj8.th.jpg Front wave breaker got the fair share of filler to. http://img361.imageshack.us/img361/3...r008dq2.th.jpghttp://img361.imageshack.us/img361/4...r006le5.th.jpg TBC... |
The recess in the wavebreaker was drilled, and steel rod was glued in to imitate the bolt / i think- its hard to tell what it is exactly from the fotos ive got, enyone? /
http://img142.imageshack.us/img142/2...l003xv9.th.jpghttp://img301.imageshack.us/img301/1...s001mb7.th.jpghttp://img150.imageshack.us/img150/9...s003is3.th.jpg TBC... |
The 20mm gun underdeck support glued underside of deck.
http://img341.imageshack.us/img341/9...k003em3.th.jpg Deck in place. http://img232.imageshack.us/img232/8...k004kn6.th.jpg Styrene strip aded to the edge. http://img87.imageshack.us/img87/395...p005jp0.th.jpghttp://img87.imageshack.us/img87/934...p002nd1.th.jpg Beer can again came handy. http://img265.imageshack.us/img265/4...p001yt8.th.jpghttp://img265.imageshack.us/img265/3...p009fz8.th.jpghttp://img84.imageshack.us/img84/161...p010dv5.th.jpg I left fraction of the milimetre protruding from the top to form sort of steel edge which is present of pictures of the real boat. TBC... |
Another thin strip of the beer can, slightly smaller than the previous one. It will highlight the lip on the edge.
http://img114.imageshack.us/img114/4...p002ao0.th.jpghttp://img254.imageshack.us/img254/8...p003er0.th.jpg The edge of the 20mm gun platform finished. TBC... |
All the doors and hatches on the bottom part of the CT have been done. Only the railing and steps remain to be added, but that will be completed in late stages of CT construction.
http://img341.imageshack.us/img341/4...l002hg8.th.jpghttp://img376.imageshack.us/img376/7...l004en4.th.jpg TBC... |
Top section of the CT.
The grilles on the sides of the tower. http://img206.imageshack.us/img206/4...2webfy5.th.jpg Original parts drilled. http://img229.imageshack.us/img229/5...e001po2.th.jpg And opened. http://img263.imageshack.us/img263/6384/4567wn1.th.jpg PE in place. The edge was planed for the PE to fit snug. Mr.Surfacer will fill the gaps. http://img338.imageshack.us/img338/7...2004ij1.th.jpg TBC... |
Radio aerial housing.
http://img127.imageshack.us/img127/4...3007zs3.th.jpg Timbers imitation sanded. http://img261.imageshack.us/img261/7...r003wy7.th.jpg Eduard PE in place http://img383.imageshack.us/img383/8...r004ao3.th.jpg Because im not using the floor rib / which in fact is only in the kit to make modelers life easier glueing together the CT halves / i decided to extend the housing right to the floor. http://img383.imageshack.us/img383/3...0061dn5.th.jpg Painted black on inside http://img159.imageshack.us/img159/4...r007yf6.th.jpg Done http://img383.imageshack.us/img383/2...r008st6.th.jpg http://img380.imageshack.us/img380/8...r009tu5.th.jpg TBC... |
Sides of the CT are of the wrong shape. Ajustment need to be made to the elevation, and curvature at the top.
http://img258.imageshack.us/img258/2...y002zj1.th.jpghttp://img528.imageshack.us/img528/4...y003aj4.th.jpghttp://img528.imageshack.us/img528/4...y005jz5.th.jpghttp://img404.imageshack.us/img404/7...y007qf9.th.jpghttp://img259.imageshack.us/img259/8...y001kp6.th.jpghttp://img403.imageshack.us/img403/4...y004eo0.th.jpg TBC... |
|
Seat on the side of CT.
I used the scrap bit of the Modelbrass deck. Added some hinges. http://img522.imageshack.us/img522/1...t003gi4.th.jpghttp://img185.imageshack.us/img185/8...2002md8.th.jpg TBC... |
All times are GMT -5. The time now is 01:00 PM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © 1995- 2025 Subsim®
"Subsim" is a registered trademark, all rights reserved.