SUBSIM Radio Room Forums



SUBSIM: The Web's #1 resource for all submarine & naval simulations since 1997

Go Back   SUBSIM Radio Room Forums > General > Sub & Naval Discussions: World Naval News, Books, & Films
Forget password? Reset here

Reply
 
Thread Tools Display Modes
Old 05-13-17, 11:09 AM   #1
ikalugin
Ocean Warrior
 
Join Date: Aug 2014
Location: Moscow, Russia
Posts: 3,212
Downloads: 8
Uploads: 0


Default The progress of Yasen-M class construction

The first Yasen-M class SSN and the second of Yasen series - Kazan is now going through her trials and would soon join Russian Navy.

The sub was first taken into the transfer dock:

and then launched into the waters from it this april:


After the rather inactive contruction of the first Yasen series - the Yasen class SSN Severodvinsk (20 years from being laid down to being accepted into service) Kazan is a de-facto leading boat in the new SSN class (Yasen-M) and was laid down in 2009.

This means that it was in construction for about 8 years, which makes the construction times compatable to European SSN programs (namely Astute class) if sadly much lengthier than the Soviet construction times or present day US ones (due to the lack of economies of scale say Victor-III or Akula series had).
__________________
Grumpy as always.
ikalugin is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 05:00 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright © 1995- 2024 Subsim®
"Subsim" is a registered trademark, all rights reserved.