View Single Post
Old 12-26-07, 01:56 PM   #4
Kron161
Sailor man
 
Join Date: Mar 2001
Posts: 47
Downloads: 7
Uploads: 0
Default

aaaa
Quote:
Originally Posted by Johann Vilthomsen
The panels for the side bulkheads are already cutted, as well as the pinewood supports for the curved ceiling ribs.

Also completed the frame for the hatch. This frame is at its time a big door that will allow to get into the room bulky stuff that otherwise would be no way to get in. The hatch is not installed in this shot, but it has also been cut.


Kron161 is offline   Reply With Quote