View Single Post
Old 08-31-16, 05:01 PM   #10
Feldpost
Watch
 
Join Date: Mar 2010
Posts: 16
Downloads: 72
Uploads: 0
Default

Quote:
Originally Posted by rentacow View Post
Imagine if one engine is being repaired you must recharge both batteries but the captain wants both screws turning also. You must really give her the beans in order to make any headway. Ahead standard will be a tall order and ahead full speed nowhere in sight! Good luck to future Wolfpack engineers!
Didn't looked yet, but i don't think that the batteries where seperated to port/starboard batteries!? - In that case it would be the scenario like in my post #4 (slow-surfaced with only one diesel-engine, while using the batteries as buffer they also get charged...).

In case both diesel engines have to be repaired:
Maybe, decouple the diesel-engines, both E-Engines switched to charging and get some men to stern on deck of boat; order: "Jump, dive and spin the propellers"

To gain some speed order the rest of crew to the deck on bow and order: "Take the rope, jump and swimm flank ahead"


Last edited by Feldpost; 08-31-16 at 05:13 PM.
Feldpost is offline   Reply With Quote