Had a problem with SH tonight, when I returned to base after a great patrol, the log listed my start date as 0/0/00. When I tried to open up the personnel file in SHC, it threw an error something about a date conversion. (Which I wasnt really surprised at)
I went into patrols and patrols_0.cfg's and edited them to reflect the correct data: date, ships sunk, tonnage, etc.
Now, on "my" personnel file, the correct tonnage and ships for that patrol are listed correctly, but the totals aren't. What file do I need to edit to correct that?