View Single Post
Old 11-20-11, 02:11 PM   #169
TheBeast
The Old Man
 
Join Date: Jan 2010
Location: Lynnwood, WA
Posts: 1,533
Downloads: 876
Uploads: 23


I think I may have figured out a way that I can add the Snorkle Brace and Pipe and have everything located correctly on each Conning Tower.

Using the SH4 Control "Position" added to each Conning Tower SIM file using cfg#M01 Node ID as Parent container or any Node on the Tower itself.
Then set the "Position" control Model ID Link to the Snorkle Model Base ID.
The cool thhing is, If the Snorkle is not installed, this "Position" control does nothing.
When the Snorkle is installed the "Position" control will adjust the Snorkle's physical location in repsect to the current Conning Tower being used.

This would enable the use of just one Snorkle Model that could be used accross all Type-VII Submarines and any Conning Tower with Pipe, Brace and Snorkle all positioned correctly.

Here is Screen Capture of Snorkle with Pipe. I have not added the Brace as yet.


Just hope I manage to have enoug free time to do this soon.

Regards!
TheBeast
__________________
Fear me! I am, TheBeastBelow

SHIV-MediaFire | SHV-MediaFire
TheBeast is offline   Reply With Quote